Thursday, 02 September 2010 | News From Indian Country
Advertisement
Home
Main Menu
HomeAbout NFICAd IndexContact UsJob ListingsiCountryTVMedia KitSearch
Latest News
Special Features
Annie Mae
Leonard Peltier
Ray Robinson
Section Menu
Akiing
Archaeology/Remains
Archived Website
Blogin' w/Paul
Books
Business News
CareerBuilder.com
Casinos/Tourism
Crime/Justice/Courts & Lawsuits
Editorial/Letters
Entertainment Stories
Food & Health
IndianCountryTV.com
International News
Mascots
Missing Persons
Movies/Films
Music
Language Programs
Native Profiles
NEWS SECTION
NFIC Columnists
NFIC Supporters
Pow Wows
Sports
Subscribe
Treaty Rights
Tribal Elections
Walking On
Web Links
Wildlife Resources
Archive
Login and/or Subscribe to NFIC
NFIC News Feed
Click RSS Feed for Instructions

Buy Cialis 20mg Online

Penobscot Nation eyeing former Maine defense site for wind farm PDF Print E-mail
User Rating: / 0
PoorBest 
Main NEWS Section - Environmental Events
Augusta, Maine (AP) July 2010

A former Cold War-era radar site and timberland not far from an existing wind farm are the latest sites in Maine that are being considered for large wind energy projects.

The Penobscot Indian Nation is in the process of purchasing land where a former Air Force “backscatter” radar station was located in the central Maine town of Moscow. The radar system, which could peek over the Earth’s horizon to detect enemy planes and missiles, was shut down in 1997 after Cold War tensions eased.

Tribal Chief Kirk Francis said the Penobscots have been looking at the 1,274-acre site for more than a year, and are now working with the General Services Administration, which owns the property, and Bureau of Indian Affairs to finalize the sale.

Francis said the tribe is focused on developing wind power at the site, but is also looking into ways to generate power using a water source there as a second phase of the project.

Meanwhile, a subsidiary of a company that has already developed major wind-generating facilities in the state, First Wind LLC of Massachusetts, is looking at a site in Carroll Plantation and Kossuth Township in eastern Maine. The proposed 25-turbine wind farm would be about eight miles south of First Wind’s existing Stetson Wind Farm.

The state Land Use Regulation Commission will consider whether to allow an expedited application for the project.

First Wind plans to file a full application with LURC this fall, but the company said it first wants all of the land for the proposed facility included in the state’s “expedited permitting area” for wind power projects. Expedited permitting allows for a streamlined application process.

The land use board will consider whether to add 695 acres in Kossuth to the expedited permitting area. The Carroll Plantation acreage already is designated for expedited permitting.

Documents filed with LURC say seven of the turbines likely would be located in Kossuth Township in Washington County while 18 will be just across the Penobscot County border in Carroll Plantation.

The two projects would be added to the 432 megawatts of wind-generated power already online or approved according to the Maine Renewable Energy Association. The state’s goal is to have 2,000 megawatts of wind energy by 2015.


Your Donation Is More Than Appreciated. It has Kept This Site Alive, Helped Train Native Students, Help Buy New Equipment and Underwritten Live Broadcasting of Native Programming That You WATCH HERE. Even a $2 donation, "MAKES A DIFFERENCE". Thank you!

Or Become a Member of the Website or Subscribe NFIC Hard Copy


Click to eBay Trading Post For Music, Clothing, Books and Native Crafts






Quote this article on your site

  Comment on this Article
RSS comments

Only registered users can write comments.
Please login or register.

Powered by AkoComment Tweaked Special Edition v.1.4.6
AkoComment © Copyright 2004 by Arthur Konze - www.mamboportal.com
All right reserved

 
< Prev   Next >
Google AdSense
Go to top of page Go to top of page
Google